| The first rough sketch of the layout. |
| | The baseboard under construction. The base is 50mm 'Kingspan' on a 50 x 25 frame with 100 x 20 round the outside, making it very light. The ropes are on pulleys to hoist it above head height when not in use. |
| | Scale drawings of the house ready to transfer to the foam board for cutting. |
| | The beginnings of the farmhouse using foamboard |
|
| Dorma windows using 3D printed frames. |
| | Doors and windows for the house. |
| | | The roof almost complete. The gap is where the chimney will fit. |
|
| House almost complete ready for painting. |
| | North East end of the house. There are still details and painting to complete. |
| | South West end of the house during assembly. |
| |
| | Creating the stonework in foamboard for the first barn. |
| | The mortar joints filled with filler. |
| | A small bridge which will be on the farm access. |
|