Near Portsoy, Banff.
The Pond Posted on 29th June 2020 Digging has almost been completed and most of the spoil has been graded and levelled with the road into the property. Two piles of around 60t of topsoil have been kept to finish off the pond edge when it finally fills. Current rate is about 8mm/day with around 600 to go! Grass/Wildflower seed has been purchased for the surrounding area but it may not be sown this year, unless it is a very open autumn. |